Evaluating Structure.Gantt? Start with what you need it for

Structure.Gantt is listed on the Atlassian Marketplace today as Gantt Charts for Structure PPM, by Tempo. It is an extension of Structure: its listing says it requires Structure 9.8 or above to be installed first. So evaluating it means evaluating Structure too. This page helps you decide whether you need that pair, or whether a standalone Gantt chart for Jira covers the job.

Looking for Structure.Gantt pricing?

The current prices for both apps are on their Marketplace pricing tabs: Gantt Charts for Structure PPM pricing and Structure pricing. Because the Gantt extension needs Structure, check both for your user tier.

We don't reproduce other vendors' prices here: they change, and the listing is the source of truth.

What the Structure pair is built for

Going by its Marketplace listing, Gantt Charts for Structure PPM visualizes the custom hierarchies you build in Structure, uses Structure's formulas for reporting, and is pitched at project portfolio scheduling, quarterly planning and capacity visualization, with baselines and workload drawn from time-tracking data.

If you need custom hierarchies that cut across Jira's own parent-child structure, portfolio-level scheduling, or you already run Structure, that is what the pair is designed for, and it is worth trialling. If what you need is a Gantt chart over the Jira issues you already have, read on.

What do you need a Jira Gantt chart for?

Go down the list. Where the middle column covers you, a standalone Gantt is enough. Where it doesn't, check the right-hand column against the Structure listings.

You need In Simple Gantt What to check if you need more
A breakdown of the work Jira's own hierarchy (epics, stories and tasks, subtasks), plus phases Whether you need custom hierarchies beyond Jira's
Dependencies All four types, read from Jira issue links (Blocks maps to Finish-to-Start by default) How links are created and which link types map
Critical path Yes, with slack and near-critical tasks -
Plan vs actual Up to 10 baselines per project, with a variance report -
Who is overloaded Workload by assignee from dates; no estimates needed Whether you need workload from time tracking or capacity planning
Several projects at once A project can be defined by a JQL query (advanced option); no portfolio roll-up Portfolio scheduling across many plans
Sharing the plan Export to CSV, PDF or PNG; share a link to the view -
Apps to install One Structure, then the Gantt extension

What setting up a standalone Gantt looks like

Install Simple Gantt from the Atlassian Marketplace and create a project by picking a Jira project. A JQL query is there as an advanced option if your plan spans projects or needs a filter. Your issues appear on the timeline with their hierarchy, dates and dependency links. If you'd rather look around first, start with the demo project.

Beyond the timeline, the project Overview gives an at-a-glance status (On track, Needs attention or At risk) built from overdue, unassigned and blocked work and schedule variance, and the Gantt flags missing dates, end-before-start dates, broken or circular dependencies and overdue critical-path tasks. See project health.

Runs on Atlassian

Simple Gantt is built on Atlassian Forge and carries the Runs on Atlassian badge: your Jira data is processed and stored within Atlassian's cloud, with no external servers. If data handling is part of your evaluation, check each app's Marketplace listing for its own badge and privacy details. Ours are on our security page.

One app for a Gantt chart over your Jira issues

Install from the Atlassian Marketplace and pick a Jira project to start.

Get Started with Simple Gantt