Choosing a BigGantt Alternative: 5 Things to Check

· Simple Gantt Team

BigGantt has been one of the longest-running Gantt apps for Jira. If you are looking at alternatives, it is usually for one of a few reasons: you want something smaller that one team can pick up quickly, you need to know exactly where your Jira data is processed, or you only use a part of what a large planning tool offers.

Whatever the reason, the same five checks apply to every Gantt app for Jira, including ours. This guide walks through each one, what to look for, and how to test it in a trial. Where it describes Simple Gantt, it says what the app does today and what it does not.

1. Dependency types

Most Jira dependencies are Finish-to-Start: one issue has to finish before the next can start. Real plans also have work that starts together (Start-to-Start), finishes together (Finish-to-Finish), or hands over (Start-to-Finish). If those matter to you, check that the app stores a type on each dependency, draws it correctly, and uses it in its scheduling maths. For what each type means, see FS, SS, FF and SF explained.

How to test it: open a project that already has Jira links. Do your existing Blocks links appear without re-entering them? Can you set a type other than Finish-to-Start?

Simple Gantt: all four types are stored, drawn from the right ends of each bar, and used by the critical path. New projects map Jira’s Blocks links to Finish-to-Start, and you can map other link types. You can add a dependency while creating a new task; a dependency between two tasks that already exist is added as a Blocks link in Jira.

2. Critical path and slack

The critical path is the chain of dependent tasks that sets your finish date; slack is how far every other task can slip without moving it. Jira’s own Timeline calculates neither, so this is often the main reason to add a Gantt app at all. See the critical path guide for Jira for how it works.

How to test it: move one task on the chain and see whether the path and the end date update, and whether you can see slack on tasks that are not on the path.

Simple Gantt: shows the critical path and near-critical tasks, with slack on every task, calculated across all four dependency types.

3. Baselines

A baseline is a saved copy of the plan you can compare today’s dates against. Check how many you can keep, and whether the app shows the variance per task or only as a picture.

How to test it: save a baseline, move a few dates, and look for a per-task variance view.

Simple Gantt: up to 10 baselines per project, with a variance report of how dates have moved since each one.

4. Where your data is processed

Every Marketplace listing shows the permissions an app asks for. Look for “Access and interact with your data from outside of Atlassian”: it means the app can work with your Jira data from systems outside Atlassian’s own infrastructure. That is common and not wrong in itself, but if your security team asks where Jira data goes, it is the line to check. The Runs on Atlassian badge on a listing means the app runs on Atlassian’s platform without sending data elsewhere.

How to test it: read the permissions section of each listing, and ask the vendor what is stored outside Atlassian.

Simple Gantt: built on Atlassian Forge and carries the Runs on Atlassian badge. It has no outbound network access, so your Jira data stays on Atlassian’s infrastructure.

5. Time to a first chart

A planning tool nobody opens does not help. Measure how long it takes from install to a chart of your own issues that someone else on the team can read.

How to test it: install, create a project from your real Jira work, and time it. Then share it with a colleague and see whether they understand it without a walkthrough.

Simple Gantt: you create a project by picking your Jira project (a JQL query is there as an advanced option), or start from a demo project you can edit. Dates, assignees and sprints come from Jira.

What BigGantt offers that Simple Gantt does not

To be fair about the trade-off: BigGantt’s Marketplace listing (checked November 2026) describes auto-scheduling, “what-if” scenarios, resource management, custom markers and work breakdown structure planning across a portfolio. Simple Gantt has no auto-scheduling, no what-if scenarios and no portfolio view today. If your process depends on automatic date recalculation or scenario planning, weigh that first.

What Simple Gantt adds instead is aimed at keeping one team’s plan honest:

  • A project health overview that rates the project On track, Needs attention or At risk, weighing overdue, unassigned and blocked work and schedule variance, and lists what needs attention
  • A Quality Check with more than a dozen automated checks, including missing dates, dependency violations and circular dependencies
  • A workload view that shows who has overlapping work, with no estimates needed
  • A sprint overlay that shows sprint boundaries on the timeline
  • Optional change history: off by default, and when you turn it on for a project it records edits made in Simple Gantt (dates, phases and custom tasks), who made them and when, and keeps the most recent changes

Trying both side by side

Neither app changes your Jira issues just by reading them, so you can evaluate Simple Gantt on the same project while BigGantt is still installed:

  1. Install Simple Gantt from the Atlassian Marketplace
  2. Create a project by picking the same Jira project you plan in BigGantt
  3. Check your dependencies — your Blocks links appear as Finish-to-Start; map other link types in the project settings
  4. Save a baseline to start tracking from this point forward
  5. Open the project overview to see what it flags in your plan

Try it alongside BigGantt on the same project

Simple Gantt reads the same Jira issues and fields, so you can evaluate both side by side without migrating anything.

Add Simple Gantt to Jira

If you have already decided to switch, see switching from BigGantt to Simple Gantt. Weighing other options too? See Gantt chart plugins for Jira compared, or Structure.Gantt and WBS Gantt-Chart.